Assembly Point / Incident Reporting

In the event of an evacuation; all staff are to assemble at the site muster point near to the substation building but as not to cause an obstruction to any emergency vehicles. If the Site is evacuated a head count will be carried out at the muster point by the lead technician or subcontractor supervisor who will also contact the OC.

Prompt reporting of any accident, incident, injury or significant near miss is paramount and these should be reported to the site manager and OC at the safest and earliest opportunity. Should there be an injury, if need be and the injury is serious, raise the alarm and call for help immediately if safe to do so.

First aid provision is located in the substation and in each WTG if required. If ANY first aid equipment is used, the Operational Controller must be informed

There are good welfare facilities at the substation comprising of toilet, kitchennette and office/rest room. The water on the site is not suitable for drinking and a fresh supply of bottled drinking water should remain readily available.