Bawnmore Wind Farm Ltd. Induction – Macroom, Cork.

The PSCS role on this site is under the control of Bawnmore Wind Farm Ltd. with David Egan (+353 (0)86 410 9155 ) being the site representative. Please read the following points before entering Bawnmore 1 (T1 – T5) or Bawnmore 2 (T6 – T11) Wind Farm sites.

The Wind Farm Operations Contact Number to call is +353 (0) 21 7355898 and notifications of all planned work on site should be emailed to: bawnmore@turnkeydev.com

Any out of hour calls should be made to the site representatives either Eamonn Lyons or David Egan.

1. Personal Protective Equipment (PPE)
H-S-SignSafety Helmet, Safety footwear, High Visibility Jacket/ Vest MUST be worn on site at all times. Other safety equipment is necessary according to the work involved e.g. eye/face protection, safety harnesses, etc. when identified in the method statements and risk assessments. Gloves are to be worn when handling materials or tools that could burn, cut, tear or cause any injury to hands.

2. Operational Controller Contact Procedure
The following procedure should be followed by all personnel visiting Bawnmore windfarm for the purposes of work, inspection or testing on the windfarm plant or infrastructure.

The windfarm is operated by Enercon Windfarm Services Ireland Ltd., under ENERCON′s operating system and Windfarm Operations WFO Ltd. are appointed as the Operational Controller.

Enercon, the HV Operator and any contractor or personnel visiting Bawnmore Windfarm for the purposes of work, inspection or testing on the windfarm plant or infrastructure must notify Windfarm Operations Ltd of their presence before entering the windfarm.

Personnel entering the windfarm will provide the following information:

ticWork party details, names and contact numbers if not already on the OC system
ticPlanned location of works,
ticReason for visit,
ticExpected finish time,
ticDescription of works,
ticAny known issues or work being undertaken at the windfarm, OC will communicate any other contractors who may be onsite,
ticFor all planned activities onsite, the OC should have prior notice and a copy of the relevant Method Statements & Risk Assessments to be emailed to the addresses below,
ticFor work on the turbines, contractors must inform the OC as they move from one turbine to another,
tic The contractor must infrom the OC of any restrictions, exceptions or limitations placed on the turbine or site,
ticAll work parties Must Notify the OC When Leaving the Site (No Exceptions)

The Windfarm Operations Contact Number is +353 (0) 21 7355898 and notifications of all planned work on site should be emailed to: bawnmore@turnkeydev.com

I agree to comply with the above mentioned rules and to follow site guidelines.