Assembly Point / Incident Reporting
In the event of an evacuation; all staff are to gather at the site assembly points. There are two assembly points on site, one is located near to the substation building and the other is by the entrance to the Cleanrath side. If the site is evacuated a head count will be carried out at the assembly point by the lead technician or subcontractor supervisor who will also contact the OC.
Prompt reporting of any accident, incident, injury or significant near miss is paramount and these should be reported to the site manager and OC at the safest and earliest opportunity. In the case of a serious injury, raise the alarm and call for help immediately if safe to do so. The closest hospital to Cleanrath windfarm is Cork University Hospital (CUH).

First aid provision is located in the substation and in each WTG if required. If ANY first aid equipment is used, the Operational Controller must be informed
There are good welfare facilities at the substation comprising of toilet, kitchennette and office/rest room. The water on the site is not suitable for drinking and a fresh supply of bottled drinking water should remain readily available.